以天津市地铁11号线某地铁站点为例,进行基坑降水水资源论证分析。项目总占地面积12 230 m2,车站主体为地下三层岛式站台,主体基坑降水面积3 938 m2;车站设2个地下2层风道和2个出入口,附属基坑降水面积2 480.5 m2。在收集建设项目支护、止水、降水井设计方案的基础上,进行了基坑降水量计算,并分析了降水对周边环境及用水户的影响。
Abstract:Taking a subway station on Tianjin Metro Line 11 as a case study, the water resources demonstration and analysis for foundation pit dewatering were conducted. The project covers a total area of 12,230 m2, with the main station being an underground three-level island platform and a main foundation pit dewatering area of 3,938 m2. The station includes two underground two-level air ducts and two entrances/exits, with an auxiliary foundation pit dewatering area of 2,480.5 m2. Based on the collected design schemes for support, water-stopping, and dewatering wells, the dewatering volume of the foundation pit was calculated, and the impact of dewatering on the surrounding environment and water users was analyzed.
[1]赵春峰,卜芸芸.某建设项目水资源论证分析[J].陕西水利,2024(7):52-54.
[2]孙怀明.焦油精深加工项目水资源论证研究[J].海河水利,2023(3):16-18,83.
[3]张欣.京津风沙源治理二期工程水资源论证研究[J].内蒙古水利,2024(2):83-84.
[4]刘池,于潇,随红全,等.承压水地层管廊基坑开挖变形特征及抗突涌稳定性分析[J].科学技术与工程,2023,23(36):15617-15626.
[5]郭星宇,冯世进.基坑开挖与承压水突涌对桩基承载力影响分析[J].地下空间与工程学报,2024,20(1):311-319.
[6]黄茂松,刘奕晖,俞剑,等.承压水地层基坑抗突涌稳定性的计算方法[J].岩土力学,2023,44(11):3071-3081.
[7]张雅洁.不同类型止水帷幕基坑涌水量计算方法探讨[J].海河水利,2023(8):98-100.
[8]李立伟,刘景兰.疏干抽排地下水水资源论证方法在基坑工程应用[J].陕西水利,2019(6):54-56.
[9]景文琪.泉域承压水地层深大基坑封底加固关键技术研究[J].施工技术(中英文),2024,53(10):57-62.
[10]潘海平,王江滨,石棚.基坑疏干抽排地下水水资源论证:以天津市会展调蓄池一工程为例[J].地下水,2023,45(5):145-147,191.
基本信息:
中图分类号:U231.3;TV213.4
引用信息:
[1]牛亚龙,吕杰.基坑降水水资源论证分析要点探析——以天津地铁11号线某站点为例[J].海河水利,2026,No.275(01):15-20.